St. Clair County — ALDOT will close either the right or left lane of I-59 southbound at various locations for grassing operations between the Ashville exit (Milepost 166) and the St. Clair Springs exit (Milepost 156) starting at 8 a.m. Monday, July 22.
All travel lanes are expected to re-open at approximately 7 p.m. on Monday.
These same lane closures will be in place from 8 a.m. until 7 p.m. from Tuesday, July 23, through Saturday, July 27.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this construction operation to improve Alabama’s roadways.